Areas of Practice

Infrastructure tunnel at Bayport

Tahal Group – Yefe Nof / 2018

As part of “infrastructure tunnel for Bayport” project, site investigation has been carried. Geotope-Levin supervised on the borehole drilling and pumping tests in order to define hydrological parameters in the tunnel alignment. The work was under managment of Tahal group.

Skip to content