Areas of Practice
- Infrastructure tunnel at Bayport
Infrastructure tunnel at Bayport
Tahal Group – Yefe Nof / 2018
As part of “infrastructure tunnel for Bayport” project, site investigation has been carried. Geotope-Levin supervised on the borehole drilling and pumping tests in order to define hydrological parameters in the tunnel alignment. The work was under managment of Tahal group.

